Summary: The following article is a part of the National Board Technical Series. This article was originally published in the October 1989 National Board BULLETIN. (3 printed pages)

 


 

With the fall heating season coming upon us, it is a good time to reconsider steps that need to be taken prior to starting boilers after a lay-up period. While this list is not all-inclusive, it can serve as a guide for those responsible for boiler operation.

Before a boiler is placed in operation, boiler operators and other responsible personnel and/or supervisors, must check over the entire system and carefully review operating procedures.

 

Operating Manuals

All manufacturers of boilers and fuel burning systems supply operating manuals with their equipment. Unfortunately, many boiler rooms do not have manuals and operating instructions available. These manuals have either been lost or misplaced. It is the responsibility of the responsible supervisor to obtain these publications and see that they are read, understood, followed and available in the boiler room.

 

Maintenance During Summer Lay-Up

The summer shutdown period is a good time to accomplish necessary boiler and fuel burning system preventive maintenance. A suggested check list of such maintenance follows:

 

Start-up Checks

Immediately prior to boiler start-up perform the following:

 

Normal Start-up

After completing the start-up checks, close the operating switch and commence the normal starting sequence. The following list suggests a typical starting sequence:

 

This starting sequence should be carefully observed to make sure that all steps are normal. Readings on flame signal strength meters (if fitted) should be observed and recorded in the boiler log.

A normal shutdown should be initiated by opening the manual burner switch. After the post purge has been completed, check the furnace for flame cutoff and make sure there is no residual flame in the furnace. Have fuel safety shutoff valves repaired or replaced if required.

Additional guidance can be found in the boiler operating manuals and in ASME CSD -1, Controls and Safety Devices for Automatically Fired Boilers, or in the National Fire Protection Association's NFPA 8500 standards on prevention of boiler furnace explosions.

 


 